| Typical phases in a project with their corresponding outputs are given below: |
| Stage |
Outputs |
| |
|
| User Requirements ( UR ) Criteria |
User Requirements Document (URD)Acceptance Test |
| Software Requirements (SR) |
Software Requirements Specification (SRS)System Test in skeletal form |
| Architectural Design (AD) |
Architectural Design Document (ADD)Integration Test Plan in skeletal form |
| Detailed Design, Code & Unit Test (DDCUT) |
Detailed Design Document (DDD)Unit Test PlansModules of CodeUnit Test Reports Approved Integration Test Plan that includes Integration Test Procedures, Integration Test Cases & Integration Test Data |
| Plans Modules of Code Unit Test |
Reports Approved |
| Integration Testing that includes System Test Cases & System Test Data |
Integration Test ReportApproved System Test Plan Procedures, System Test |
| System Testing |
System Test Report |